¢¹ HOME > Business Group > Plant Construction > Products  
 
 
- Project: 345KV Taean-Sinseosan T/L Construction
- Contracted By: KEPCO
- Construction Period: Jun. 4, 2001~Aug. 22, 2003
- Project Scale: Line (24.966km) Circuit (49.932km)
   * Number of Pylons / 18 Steel Pylons
- Location: Taean-eup, Taean-gun,
  Chungcheongnam-do

- A transmission line construction for the supply of power from the Taean Thermal
  Power Plant.

    ¡Û Pylon seen from below at 345KV Taean-Sinseosan T/L Construction Site
    
¡Û Overview of pylons at 345KV Taean-Sinseosan T/L Construction Site